
In the summer of 2025, REAX partnered with Altrad Services, a leading industrial services provider, to support a challenging high-altitude cladding reinforcement project using ActSafe ACX powered ascenders.
The project involved repeated access to a 50-metre-high building elevation, carried out by a small three-person team working under tight time and safety constraints. Traditional access methods were physically demanding, time-consuming, and increased the risk of fatigue in a high-risk environment.
This case study highlights how the introduction of powered ascenders, supported by REAX training, consultancy, and equipment support, transformed the way the project was delivered.
View the full Altrad Services case study to explore the project in detail, including site feedback and operational insights.
👉 Read the full case study (PDF) ↗︎
Altrad’s team faced several operational pressures:
With access efficiency and worker wellbeing critical to project success, an alternative solution was needed.
REAX supplied and supported two ActSafe ACX powered ascenders, delivering a complete package that included:
The ACX units were deployed over an eight-week period and used daily for personnel access and equipment handling, significantly reducing physical demands on the team
The impact was immediate and measurable:
Beyond this project, Altrad identified clear opportunities to adopt powered ascenders across future works.
This project demonstrates how powered ascenders, when paired with the right training and planning, can:
We support clients with the full lifecycle of powered ascender use:
All tailored to your site, your team, and your operational needs.
Even the best kit needs regular inspection and servicing. we have a team of fully trained PPE inspectors who can take the worry out of the process. Our servicing team are fully certified to carry out the servicing requirements for many of the leading rescue devices currently on the market.















